Loads and freight
Hauling machinery and pipe on a flatbed or step deck
Updated October 2026By FlatbedDispatch Dispatch Desk5 min read
Quick answer
Hauling machinery of 10,000 lb or more falls under 49 CFR 393.130: lower and secure attachments, lock articulation, and use at least four tiedowns at the front and rear. Pipe needs blocking against rolling, and concrete pipe has its own rule in 393.124. In both cases the working load limits must add up to half the cargo weight.
General information, not legal advice. Check the current text of 49 CFR Part 393 and any instructions from the equipment maker or shipper.
Hauling machinery and pipe is where open-deck trailers earn their keep. Excavators, loaders, tractors and pipe do not fit in a box, and they bring their own securement rules. Get them wrong and the numbers are clear: machinery not secured to its rule drew 11,558 roadside violations in two years, almost all of them out-of-service (our analysis of FMCSA securement violations has the detail). This guide covers the machinery rule, the pipe rules and the working load limit math, with a worked example.
Heavy machinery hauling: the 393.130 rule
49 CFR 393.130 covers wheeled or tracked vehicles, equipment and machinery of 10,000 lb or more each: loaders, dozers, excavators, tractors, power shovels. Lighter units can use this section, the vehicle rule in 393.128, or the general rules.
Before you tie it down:
- Lower attachments (buckets, blades, booms, shovels) completely and secure them to the trailer.
- Lock articulated machines so they cannot bend at the joint.
Securement:
- Restrain the machine against forward, rearward, sideways and upward movement.
- Use at least four tiedowns.
- Attach them as close as practicable to the front and rear of the machine, or to tie-down points the maker designed for it.
Four is the minimum, not the answer. The working load limit total still has to reach half the machine's weight, and that is where many loads come up short.
The WLL math on a direct tiedown
How a tiedown counts depends on how it runs (393.106(d)):
| Tiedown path | Counts toward the total |
|---|---|
| Trailer anchor straight to a point on the machine | 50% of its WLL |
| Over or around the cargo, back to the same side | 50% of its WLL |
| Over or around the cargo, to the opposite side | 100% of its WLL |
Machinery is almost always chained direct, trailer to machine, so each chain counts half.
EXAMPLE: a 32,000 lb excavator on a step deck. You need at least 16,000 lb of aggregate WLL. Four 3/8 in grade 70 chains are rated 6,600 lb each (393.108), but chained direct they count 3,300 lb each: 13,200 lb, not enough. Options that pass:
| Setup | Counted WLL | Passes 16,000 lb? |
|---|---|---|
| 4 x 3/8 in grade 70, direct | 4 x 3,300 = 13,200 lb | No |
| 6 x 3/8 in grade 70, direct | 6 x 3,300 = 19,800 lb | Yes |
| 4 x 1/2 in grade 70 (11,300 lb), direct | 4 x 5,650 = 22,600 lb | Yes |
Binders and anchor points must match or the assembly drops to the weakest part. Our load securement calculator runs this check, including the four-tiedown machinery minimum.
Machinery hauling: practical points
- Know the machine's weight and dimensions before you book. Ask for the model and attachments. A bucket or thumb can add thousands of pounds and a foot of width.
- Watch height. An excavator on a 5 ft flatbed deck goes over 13 ft 6 in quickly. That is why most machinery rides on a step deck. See our step deck dispatch page.
- Width means permits. Over 8 ft 6 in wide needs oversize load permits in every state on the route.
- Ramps and loading. Many step decks load machines over ramps. Confirm who drives the machine on and off; usually it is the shipper or receiver, not you.
- Grease, mud and tracks. Clean decks and wood blocking under steel tracks help keep the machine from sliding.
Farm machinery hauling
Tractors, combines, sprayers, planters and tillage tools follow the same rules: 393.130 for wheeled machines of 10,000 lb or more, the general rules for implements. What changes is size. A combine head, a wide planter or a big tillage tool is often over legal width, and some states limit the hours and seasons for wide farm moves. Check the permits before you quote, and ask whether the head ships separately on its own cart.
Hauling pipe
Concrete pipe (393.124)
49 CFR 393.124 applies to concrete pipe on flatbeds and lowboys, unless the pipe is bundled into a rigid unit that cannot roll.
- Group by size. Different diameters go in separate groups, each secured on its own.
- Load in wells. The bottom tier is blocked at each end; upper-tier pipes sit only in the wells of the tier below, and a third tier cannot start until those wells are full.
- Blocking is at least 4 x 6 in timber, placed symmetrically and held firmly against the pipe.
- Up to 45 in inside diameter: tiedowns through the front and rear pipes of the bottom tier, angled where practicable, plus either individual tiedowns or longitudinal chain or wire rope over the group and one transverse tiedown for every 10 ft of load length.
- Over 45 in: at least one tiedown through each pipe, angled rearward for the front half and forward for the rear half.
Steel pipe and other round stock
Steel pipe has no commodity section of its own, so the general rules apply:
- Stop the roll. Anything likely to roll needs chocks, wedges, a cradle or equivalent (393.106(c)).
- Count per article. Each pipe, or each tightly banded bundle, is an article under 393.110. A 40 ft joint not blocked at the front needs 2 tiedowns for the first 10 ft plus 3 for the rest: 5.
- WLL total of at least half the weight, as always.
- Protect strap edges at the pipe ends and on beveled ends.
Chains vs straps
| Grade 70 chain | 4 in strap | |
|---|---|---|
| Default WLL (393.108) | 6,600 lb at 3/8 in, 11,300 lb at 1/2 in | 4,000 lb |
| Best for | Machinery, steel, coils, anything with sharp or hot edges | Finished, painted or coated freight, lumber, pipe with protection |
| Weak spots | Heavier to handle; can mark soft freight | Cuts on edges, stretches, UV and wear |
| Common setup | Direct to machine tie-downs with ratchet binders | Over the load, rail to rail, with edge protectors |
Neither is required by the rules; both must be marked or counted at the default rating. Our flatbed gear checklist lists quantities and prices for each.
Who books machinery and pipe
Machinery moves through equipment dealers, rental companies, contractors and specialized brokers, and some lease-on carriers focus on it; see how flatbed companies compare if you are deciding between leasing on and your own authority. Small fleets mixing flatbeds and step decks often split the work: step decks take the tall machines, flatbeds take the pipe. Our flatbed fleet dispatch page explains how we plan both on one desk. More guides are on the guides page.
FAQ
Common questions
How many chains do I need to haul an excavator?
At least four under 49 CFR 393.130, placed as close as practicable to the front and rear or to the maker's tie-down points. You may need more: chains that run from the trailer straight to the machine count half their working load limit, and the total must reach half the machine's weight.
Can I use straps instead of chains on machinery?
The rule does not ban straps; it requires enough working load limit and tiedowns that will not be cut or loosen. In practice chain is the usual choice on tracked and steel equipment because straps wear fast on steel edges and stretch more. Use edge protection on any strap that touches a sharp edge.
What are the rules for hauling concrete pipe?
49 CFR 393.124 covers concrete pipe on flatbeds. Pipes of different diameters go in separate groups, the bottom tier is blocked at each end, upper tiers sit in the wells below, and pipe over 45 in inside diameter needs tiedowns through each pipe. Tightly bundled pipe that cannot roll follows the general rules.
Do I need a permit to haul farm machinery?
Only if the load is over legal size or weight. Combines, tillage tools and big tractors are often over 8 ft 6 in wide, which means oversize permits in every state on the route. Some states have separate rules for farmers moving their own equipment; a for-hire carrier follows the normal permit rules.
Sources
- 49 CFR 393.130, heavy vehicles, equipment and machinery (eCFR) (checked Oct 26, 2026)
- 49 CFR 393.124, concrete pipe (eCFR) (checked Oct 26, 2026)
- 49 CFR 393.106, rolling articles and aggregate working load limit (eCFR) (checked Oct 26, 2026)
- 49 CFR 393.108, working load limits (eCFR) (checked Oct 26, 2026)
- 49 CFR 393.110, minimum number of tiedowns (eCFR) (checked Oct 26, 2026)
- 49 CFR 393.128, automobiles, light trucks and vans (eCFR) (checked Oct 26, 2026)
FlatbedDispatch Dispatch Desk
Written by the dispatchers who book open-deck loads every day, checked against the official sources above. See our editorial policy for how we research and correct guides.